235 kWp off-grid solar power plant for solarization of THR in Unnao, Fatehpur and Varanasi

235 kWp off-grid solar power plant for solarization of THR in Unnao, Fatehpur and Varanasi

235 (100+74.665+60) kWp off-grid rooftop solar power plants were being installed in various locations of UP (Unnao, Fatehpur and Varanasi) and commissioned on 04.08.2023 in Unnao, 11.12.2023 in Varanasi and on 15.02.2024 in Fatehpur under Sustain Plus programme organised byb CINI. The Plant exerted polycrystalline solar cells of 555 WP capacity. Total 428 (180+137+111) PV solar panels and 3 invertors of 100 WP have been placed. Solar Panels and Invertors were procured from SOVAL SOLAR and STATCON ENERGIA accordingly.

One IoT based RMS of Trackso is implemented in Fatehpur. In Unnao and Varanasi one RMS of Rash Urja have been integrated at each site. User IDs and passwords are as follows to monitor the performance.

Unnao: User ID: ravi@energysuncraft.net & Password: Sun@1234

Fatehpur: User ID: nravi896@gmail.com & Password: Ravi@123

Varanasi: User ID: ravi@energysuncraft.net & Password: Sun@1234

Location :

Uttarpradesh

Size of Plant :

235 kWp

Date of Commissioning :

15/02/2024